440 lines
30 KiB
PHP
440 lines
30 KiB
PHP
@extends('indexlayout')
|
|
|
|
@section('title', 'Dinas')
|
|
@push('style')
|
|
@endpush
|
|
@section('content')
|
|
<main id="js-page-content" role="main" class="page-content">
|
|
<ol class="breadcrumb page-breadcrumb">
|
|
<li class="breadcrumb-item"><a href="javascript:void(0);">Realisasi Kinerja & Anggaran</a></li>
|
|
<li class="breadcrumb-item active">Kinerja</li>
|
|
<li class="breadcrumb-item active">Kegiatan Prioritas</li>
|
|
<li class="position-absolute pos-top pos-right d-none d-sm-block"><span class="js-get-date"></span></li>
|
|
</ol>
|
|
|
|
<div class="row">
|
|
<div class="col-xl-12">
|
|
<div id="panel-1" class="panel">
|
|
<div class="panel-hdr">
|
|
<h2>
|
|
Kegiatan Prioritas
|
|
</h2>
|
|
|
|
</div>
|
|
<div class="panel-container show">
|
|
<div class="panel-content table">
|
|
<div style="overflow-x:auto; white-space: nowrap; display: block; width: 100%;">
|
|
<!-- datatable start -->
|
|
<table id="dt-kegiatan1" class="table table-bordered table-hover table-striped w-100">
|
|
<thead>
|
|
<tr>
|
|
<td>NO</td>
|
|
<td>UNIT KERJA</td>
|
|
<td>SUBKEGIATAN</td>
|
|
<td>AKTIVITAS/SUBTITLE</td>
|
|
<td>ANGGARAN</td>
|
|
<td>APBD PERUBAHAN</td>
|
|
<td>KONTRAK Penyedia & Tanggal</td>
|
|
<td>Kontrak Nilai (Rp)</td>
|
|
<td>Kontrak (%)</td>
|
|
<td>Realisasi (Rp)</td>
|
|
<td>Realisasi (%)</td>
|
|
<td>PROGRES 31 OKTOBER 2024</td>
|
|
</tr>
|
|
</thead>
|
|
<tbody>
|
|
<tr>
|
|
<td>1</td>
|
|
<td>Dinas Lingkungan Hidup</td>
|
|
<td>Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya</td>
|
|
<td>Rehabilitasi Gedung Dinas Lingkungan Hidup</td>
|
|
<td>24,003,075,193</td>
|
|
<td>24,003,075,193</td>
|
|
<td>PT Putra Bayak & 2 Agustus 2024 sd 29 Desember 2024 (Rehab Gedung
|
|
Dinas)<br>
|
|
LPPM-ITB & 2 Agustus 2024 sd 29 Desember 2024 (Jasa Konsultansi
|
|
Perencanaan
|
|
Pembangunan Kawasan Kantor DLH)<br> PT Rebbeka Gemilang & 3 September sd
|
|
1
|
|
Desember 2024 (Pembangunan Aula Asrama Ciracas)<br> CV Wonpis Jaya Mandiri
|
|
&
|
|
3 September 2024 sd 1 Desember 2024 (Pembangunan Pagar Asrama Ciracas)<br>
|
|
PT
|
|
Trideka Desain Kreasi & 7 Februari sd 7 Maret 2024 (Review Perencanaan
|
|
Rehab
|
|
Gedung)<br> PT Shinawit Indomas & 7 Mei sd 5 Juli 2024 (Perbaikan Toilet
|
|
dan
|
|
Plafon)</td>
|
|
<td>13,655,987,796.00</td>
|
|
<td>56.89%</td>
|
|
<td>891,253,582</td>
|
|
<td>3.71%</td>
|
|
<td>Pembangunan Rehab Gedung Kantor Dinas Lingkungan Hidup: Progres pekerjaan
|
|
45,879% (deviasi+4,138%)<br> Pembangunan Aula Asrama Ciracas : Progres
|
|
46,644%
|
|
(deviasi + 3,037%)<br> Pembangunan Pagar Asrama Ciracas : Selesai <br>
|
|
</td>
|
|
</tr>
|
|
<tr>
|
|
<td>2</td>
|
|
<td>Dinas Lingkungan Hidup</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Pengadaan KDO / KDOK</td>
|
|
<td>60,909,945,449</td>
|
|
<td>273,875,241,459.00</td>
|
|
<td>PT Impact Enviro Industri (10 Juni 2024 sd 20 November 2024)<br> PT Pemuda
|
|
Sukses Abadi (19 Juni 2024 sd 11 November 2024)<br> PT Grahabumi Inovasi
|
|
Nusantara (27 Juni 2024 sd 13 Desember 2024)<br> PT Langgeng Kencana Asri
|
|
(15
|
|
Juli 2024 sd 15 Desember 2024)</td>
|
|
<td>50,850,950,000.00</td>
|
|
<td>18.57%</td>
|
|
<td> </td>
|
|
<td>0.00%</td>
|
|
<td>Compactor kecil 4unit : Proses pengiriman<br> Compactor sedang (10 unit):
|
|
Proses
|
|
impor <br> Tong Sampah Beroda (536 buah): Sudah Berkontrak<br> Compactor
|
|
Listrik
|
|
kecil (5 unit): Proses impor<br> Truk Arm Roll Kecil + Bak Kontainer
|
|
Tertutup
|
|
(12 unit): sudah berkontrak<br> Mini dump (5 unit): Proses impor<br>
|
|
Charging
|
|
Station (1 unit): Terkendala waktu penandatanganan kontrak</td>
|
|
</tr>
|
|
<tr>
|
|
<td>3</td>
|
|
<td>Sudin LH Jakarta Pusat</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Rehab/Perbaikan TPS/TPS3R</td>
|
|
<td>1,133,859,983</td>
|
|
<td>2,953,908,716.00</td>
|
|
<td>Pelaksana pekerjaan konstruksi<br> PT. Bina Mitra Wahana & 23 Oktober
|
|
2024
|
|
s.d 21 November 2024 (Jasa CV. Mega Data Konsulindo Jaya & 23 Oktober
|
|
s.d 21
|
|
November 2024<br> CV. Juntak Jaya Konstruksi & 24 Oktober s.d 22
|
|
November
|
|
2024<br> PT. Tiga Persada Nusantara & 28 Oktober s.d 26 November
|
|
2024<br>
|
|
PT. Gara Samudra Perkasa & 7 Oktober s.d 5 November 2024<br> PT.
|
|
Peatalun
|
|
Jaya & 28 Oktober 2024 s.d 26 November 2024</td>
|
|
<td>928,246,600.00</td>
|
|
<td>31.42%</td>
|
|
<td> </td>
|
|
<td>0.00%</td>
|
|
<td>Proses pelaksanaan Kegiatan di 5 lokasi yaitu Petojo Enclek, TPS Gunung
|
|
Sahari,
|
|
GBK, Sawah Besar, Tanjung Selor</td>
|
|
</tr>
|
|
<tr>
|
|
<td>4</td>
|
|
<td>Sudin LH Jakarta Utara</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Peningkatan TPS menjadi TPS 3R</td>
|
|
<td>35,144,671,652</td>
|
|
<td>37,234,420,215</td>
|
|
<td>PT. Bina Mitra Wahana & 28 Oktober 2024 s.d 30 Desember 2024 (Jasa
|
|
Konsultansi TPS 3R Sunter Jaya)<br> PT. Timbang Cipta Laksana & 28
|
|
Oktober
|
|
2024 s.d 30 Desember 2024 (TPS 3R Sunter Jaya)<br> PT. Pranata Pola Cipta
|
|
&
|
|
28 Oktober 2024 s.d 30 Desember 2024 (Jasa Konsultansi TPS 3R Asrama
|
|
Semper)<br>
|
|
PT. Goval Teknik Samudra & 28 Oktober 2024 s.d 30 Desember 2024 (TPS 3R
|
|
Semper Barat)</td>
|
|
<td>8,548,993,862</td>
|
|
<td>22.96%</td>
|
|
<td> </td>
|
|
<td>0.00%</td>
|
|
<td>Proses pelaksanaan pembangunan TPS di Asrama Semper dan Sunter Jaya,
|
|
pengadaan
|
|
mesin proses pemilihan</td>
|
|
</tr>
|
|
<tr>
|
|
<td>5</td>
|
|
<td>Sudin LH Jakarta Barat</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Peningkatan TPS menjadi TPS 3R Asrama Bambu Larangan</td>
|
|
<td>13,078,117,265</td>
|
|
<td>13,078,117,265</td>
|
|
<td>CV. Galung Brothers & 16 Oktober 2024 s.d 19 Desember 2024<br> PT. Mario
|
|
Mikron Metalindo & 21 Oktober 2024 s.d 19 Desember 2024<br> PT. Istana
|
|
Kreasi Indah Cipta & 16 Oktober 2024 s.d 19 Desember 2024</td>
|
|
<td>12,658,846,642</td>
|
|
<td>96.79%</td>
|
|
<td> </td>
|
|
<td>0.00%</td>
|
|
<td>Proses pelaksanaan Pembangunan TPS Asrama Bambu Larangan, pengadaan mesin
|
|
sudah
|
|
berkontrak</td>
|
|
</tr>
|
|
<tr>
|
|
<td>6</td>
|
|
<td>Sudin LH Jakarta Selatan</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Peningkatan TPS menjadi TPS 3R Menteng Atas</td>
|
|
<td>14,112,022,121</td>
|
|
<td>18,905,247,640</td>
|
|
<td> </td>
|
|
<td> </td>
|
|
<td>0.00%</td>
|
|
<td>76,590,000</td>
|
|
<td>0.41%</td>
|
|
<td>Tidak dilaksanakan terkendala waktu </td>
|
|
</tr>
|
|
<tr>
|
|
<td>7</td>
|
|
<td>Sudin LH Jakarta Timur</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Peningkatan TPS menjadi TPS 3R Rawa Teratai</td>
|
|
<td>26,258,386,209</td>
|
|
<td>26,258,211,865</td>
|
|
<td>PT. Odorma Tiara Handayani & 23 Oktober 2024</td>
|
|
<td>7,394,002,007</td>
|
|
<td>28.16%</td>
|
|
<td>1,015,008,049</td>
|
|
<td>3.87%</td>
|
|
<td>Proses pelaksanaan pembangunan TPS Rawa Teratai, pengadaan mesin proses
|
|
pemilihan</td>
|
|
</tr>
|
|
<tr>
|
|
<td>8</td>
|
|
<td>Sudin LH Kepulauan Seribu</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Pembangunan Fasilitas Pengelolaan Sampah (Pulau Panggang)</td>
|
|
<td>9,364,992,696</td>
|
|
<td>9,364,992,696</td>
|
|
<td>PT. Herpis Pertoma Mulia & 11 Juli 2024 s.d 31 Desember 2024 (Jasa
|
|
Konsultansi)<br> PT. Asiana Technologies Lestary & 11 Juli 2024 s.d 31
|
|
Desember 2024</td>
|
|
<td>8,956,000,000</td>
|
|
<td>95.63%</td>
|
|
<td>4,477,190,746</td>
|
|
<td>47.81%</td>
|
|
<td>Progres pelaksanaan 73,79% deviasi (+2,39%)</td>
|
|
</tr>
|
|
<tr>
|
|
<td>9</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Pembangunan RDF Plant Jakarta</td>
|
|
<td>1,319,999,999,992</td>
|
|
<td>1,319,999,999,992</td>
|
|
<td>Konsorsium WIKA - Jaya Konstruksi ;<br> KSO PT. Yodya Karya, PT. Kogas
|
|
Driyap
|
|
Konsultan, PT. Amythas</td>
|
|
<td>1,301,321,070,361</td>
|
|
<td>98.58%</td>
|
|
<td>582,383,094,223</td>
|
|
<td>44.12%</td>
|
|
<td>Progres pelaksanaan 56,66% (deviasi+0,03%)</td>
|
|
</tr>
|
|
<tr>
|
|
<td>10</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pengoperasian dan Pemeliharaan TPA/TPST Regional</td>
|
|
<td>Pengadaan Alat Berat UPST</td>
|
|
<td>19,233,810,840</td>
|
|
<td>43,576,893,044</td>
|
|
<td>PT. Roda Utama Andalan Sejahtera & 20 Mei s.d 18 Juni 2024<br> PT.
|
|
United
|
|
Tractors Tbk & 26 Februari s.d 24 Mei 2024<br> PT. United Tractors Tbk
|
|
&
|
|
26 Februari s.d 24 Mei 2024<br> PT. Cakra Mix Indonesia & 1 Februari s.d
|
|
2
|
|
April 2024<br> PT. Ultratex Indonesia & 25 Januari s.d 14 Maret 2024<br>
|
|
PT.
|
|
Pemuda Sukses Abadi & 4 Maret s.d 3 Juni 2024<br> PT. Indomobil Prima
|
|
Niaga
|
|
& 7 Maret s.d 3 Agustus 2024</td>
|
|
<td>18,509,133,575</td>
|
|
<td>42.47%</td>
|
|
<td>18,509,133,575</td>
|
|
<td>42.47%</td>
|
|
<td>Selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>11</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pengoperasian dan Pemeliharaan TPA/TPST Regional</td>
|
|
<td>Pengadaan Mesin Pengolahan Sampah</td>
|
|
<td>12,492,728,100</td>
|
|
<td>12,492,728,100</td>
|
|
<td>PT. Mario Mikron Metalindo & 3 Juni 2024</td>
|
|
<td>12,280,876,000</td>
|
|
<td>98.30%</td>
|
|
<td>0</td>
|
|
<td>0.00%</td>
|
|
<td>Proses pelaksanaan, kontrak sampai dengan November 2024</td>
|
|
</tr>
|
|
<tr>
|
|
<td>12</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pengoperasian dan Pemeliharaan TPA/TPST Regional</td>
|
|
<td>Pengadaan Kendaraan Operasional</td>
|
|
<td>4,331,396,821</td>
|
|
<td>10,149,296,575</td>
|
|
<td>PT. Pemuda Sukses Abadi & 31 Januari 2024 s.d 29 April 2024</td>
|
|
<td>4,256,200,000</td>
|
|
<td>41.94%</td>
|
|
<td>4,254,000,000</td>
|
|
<td>41.91%</td>
|
|
<td>Selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>13</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pengelolaan Fasilitas Landfill Mining dan RDF Plant</td>
|
|
<td>Pengelolaan Fasilitas Landfill Mining dan RDF Plant</td>
|
|
<td>67,771,162,199</td>
|
|
<td>27,582,457,845</td>
|
|
<td> </td>
|
|
<td> </td>
|
|
<td>0.00%</td>
|
|
<td>844,370,387</td>
|
|
<td>3.06%</td>
|
|
<td>Proses pelaksanaan pekerjaan</td>
|
|
</tr>
|
|
<tr>
|
|
<td>14</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Rehabilitasi IPAS TPST Bantargebang</td>
|
|
<td>Rehabilitasi IPAS TPST Bantargebang</td>
|
|
<td>14,230,274,037</td>
|
|
<td>15,308,242,634</td>
|
|
<td>PT. Selo Cipta Utama & 22 Juli 2024 s.d 18 Desember 2024<br> PT. Balqis
|
|
Mandiri Konsultan & 22 Juli 2024 s.d 18 Desember 2024</td>
|
|
<td>3,191,620,979</td>
|
|
<td>20.85%</td>
|
|
<td>3,191,620,979</td>
|
|
<td>20.85%</td>
|
|
<td>Progres pekerjaan 52%</td>
|
|
</tr>
|
|
<tr>
|
|
<td>15</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pemeliharaan Jalan Operasional</td>
|
|
<td>Pemeliharaan Jalan Operasional TPS Bantargebang</td>
|
|
<td>9,799,994,784</td>
|
|
<td>21,697,515,132</td>
|
|
<td>PT. Tamado Konstruksi Selaras & 9 Juli 2024 s.d 5 November 2024</td>
|
|
<td>9,281,304,265</td>
|
|
<td>42.78%</td>
|
|
<td>9,281,304,265</td>
|
|
<td>42.78%</td>
|
|
<td>selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>16</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pembangunan Dinding Penahan Zona</td>
|
|
<td>Pembangunan Dinding Penahan zona</td>
|
|
<td>21,241,287,472</td>
|
|
<td>21,241,287,472</td>
|
|
<td>PT. Marina Cipta & 21 Februari 2024<br> PT. Varas Ratubadis Prambanan
|
|
&
|
|
31 Mei 2024<br> PT. Danureksa Sarana Cipta & 31 Mei 2024</td>
|
|
<td>21,190,207,500</td>
|
|
<td>99.76%</td>
|
|
<td>21,190,207,500</td>
|
|
<td>99.76%</td>
|
|
<td>selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>17</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Penurapan Kali di TPST Bantargebang</td>
|
|
<td>Penurapan Kali di TPST Bantargebang</td>
|
|
<td>9,019,751,298</td>
|
|
<td>9,019,751,298</td>
|
|
<td>PT. Ardia Mandiri & 20 Februari 2024<br> PT. Bumi Madani & 20 Mei
|
|
2024<br> PT. Anggi Gian Putra & 20 Mei 2024</td>
|
|
<td>9,010,268,170</td>
|
|
<td>99.89%</td>
|
|
<td>9,003,885,670</td>
|
|
<td>99.82%</td>
|
|
<td>selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>18</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pembangunan Hanggar dan TPS B3</td>
|
|
<td>Bangunan Gedung Hanggar/Bengkel</td>
|
|
<td>16,175,707,212</td>
|
|
<td>16,175,707,212</td>
|
|
<td>PT. Fasade Kobetama Internasional & 20 Februari 2024 s.d 20 Mei 2024<br>
|
|
CV.
|
|
Noverianto Putra Perkasa & 25 Juni 2024 s.d 21 November 2024<br> PT.
|
|
ALFRIZ
|
|
AULIATAMA & 25 Juni 2024 s.d 21 November 2024</td>
|
|
<td>15,994,507,500</td>
|
|
<td>98.88%</td>
|
|
<td>1,402,901,250</td>
|
|
<td>8.67%</td>
|
|
<td>Progres pekerjaan 55%</td>
|
|
</tr>
|
|
<tr>
|
|
<td>19</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pembangunan sarana zona titik buang</td>
|
|
<td>Pembangunan Sarana Zona Titik Buang</td>
|
|
<td>5,802,116,964</td>
|
|
<td>5,802,116,964</td>
|
|
<td>PT. TAMBORA SETIA JAYA & 24 April 2024 s.d 22 Juli 2024</td>
|
|
<td>1,192,850,400</td>
|
|
<td>20.56%</td>
|
|
<td>1,192,850,400</td>
|
|
<td>20.56%</td>
|
|
<td>selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>20</td>
|
|
<td>Unit Pengelola Sampah Terpadu</td>
|
|
<td>Pembangunan Pagar TPST Bantargebang</td>
|
|
<td>Pembangunan Pagar TPST Bantargebang</td>
|
|
<td>1,079,488,964</td>
|
|
<td>1,079,488,964</td>
|
|
<td>PT. ALFRIZ AULIATAMA & 19 Juni 2024 s.d 18 Juli 2024<br> PT. Phoenik
|
|
Syams
|
|
Indonesia & 9 Agustus 2024 s.d 7 Oktober 2024<br> PT. TODO CONSULT &
|
|
9
|
|
Agustus 2024 s.d 7 Oktober 2024</td>
|
|
<td>1,016,477,700</td>
|
|
<td>94.16%</td>
|
|
<td>1,016,477,700</td>
|
|
<td>94.16%</td>
|
|
<td>selesai</td>
|
|
</tr>
|
|
<tr>
|
|
<td>21</td>
|
|
<td>Unit Penanganan Sampah Badan Air</td>
|
|
<td>Pemrosesan Akhir di TPA/TPST Regional</td>
|
|
<td>Pembangunan Fasilitas Pendukung Saringan Sampah TBSimatupang</td>
|
|
<td>26,687,565,592</td>
|
|
<td>26,687,565,592</td>
|
|
<td>PT. Mitra Ciasem Raya & 19 Juli 20224 s.d 20 Desember 2024</td>
|
|
<td>23,426,150,822.00</td>
|
|
<td>87.78%</td>
|
|
<td>7,503,762,240</td>
|
|
<td>28.12%</td>
|
|
<td>Sudah dibayarkan termin 1 30% Progres 40,31%</td>
|
|
</tr>
|
|
</tbody>
|
|
</table>
|
|
<!-- datatable end -->
|
|
</div>
|
|
</div>
|
|
</div>
|
|
</div>
|
|
</div>
|
|
</div>
|
|
</main>
|
|
|
|
@endsection
|
|
|
|
@push('script')
|
|
<script src="{{ asset('layout/dist/js/datagrid/datatables/datatables.bundle.js') }}"></script>
|
|
<script src="{{ asset('layout/dist/js/kegiatan.js') }}"></script>
|
|
@endpush
|